Hamilton Port Authority, Pier 15, Shed 12
This project involved the Asbestos Abatement, Demolition, Asset Recovery and Concrete Crushing of a 90,000 Square Foot abandoned former Industrial Building. Once all of the identified Asbestos containing materials was removed from the within all of the buildings, the demolition proceeded. All of the slab-on-grade and foundations were left in place, as the structure was built on Lake Erie infill lands, and the caissons and associated stabilizing methods were to be reused. Following the structure removal, all 4,800 tonnes of concrete from the structure was crushed and stockpiled onsite for future re-use.